- Feed Queries
- All Stories
- Search
- Feed Search
- Transactions
- Transaction Logs
Feed Search
Aug 7 2025
Aug 7 2025
natali-rs1985 updated the task description for T7678: Move "vpp settings host-resources" to "system option host-resources".
natali-rs1985 closed T7655: VPP HugePages calculation is incorrect, a subtask of T7070: VPP related bugs the root task, as Resolved.
natali-rs1985 moved T7655: VPP HugePages calculation is incorrect from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
natali-rs1985 moved T7655: VPP HugePages calculation is incorrect from Need Triage to Completed on the VyOS Rolling board.
Aug 6 2025
Aug 6 2025
jestabro moved T7645: Fix missing import and incorrect check in nat64 from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
sarthurdev moved T7628: Configuration encryption doesn’t work with no TPM present from Backport Candidates to Completed on the VyOS Rolling board.
Viacheslav updated the task description for T7695: VPP add verifications to not allow user to configure low values for main-heap-size.
Viacheslav triaged T7695: VPP add verifications to not allow user to configure low values for main-heap-size as Normal priority.
Viacheslav closed T7668: Update fails if the system does not have system options kernel as Resolved.
Viacheslav moved T7175: VPP add sflow plugin from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
This task can be closed. Initial implementation completed.
@ServerForge, let us know if you want to claim some tasks regarding bugs.
Thanks.
Viacheslav closed T7175: VPP add sflow plugin, a subtask of T7221: VPP related features the root task, as Resolved.
Viacheslav added a parent task for T7691: VPP delete sFlow configuration does not work: T7070: VPP related bugs the root task.
I have created 2 bug reports https://vyos.dev/T7690 and https://vyos.dev/T7691
Viacheslav added a subtask for T7070: VPP related bugs the root task: T7690: VPP add new interface to sFlow fails.
Viacheslav added a parent task for T7690: VPP add new interface to sFlow fails: T7070: VPP related bugs the root task.
Viacheslav moved T7651: If VPP crashes, the system loads without hugepages from Need Triage to Completed on the VyOS Rolling board.
Viacheslav closed T7651: If VPP crashes, the system loads without hugepages, a subtask of T7070: VPP related bugs the root task, as Resolved.
Viacheslav updated the task description for T7689: VPP IPsec traffic stops working after the reboot.
Viacheslav added a parent task for T7689: VPP IPsec traffic stops working after the reboot: T7070: VPP related bugs the root task.
natali-rs1985 closed T7658: Changing hugepages can affect and VPP config cannot load after this action, a subtask of T7070: VPP related bugs the root task, as Resolved.
natali-rs1985 closed T7659: VPP settings host-resources max-map-count does not affect sysctl changes as Resolved.
Movinghost-resources to another section. https://vyos.dev/T7678
natali-rs1985 closed T7659: VPP settings host-resources max-map-count does not affect sysctl changes, a subtask of T7070: VPP related bugs the root task, as Resolved.
natali-rs1985 closed T7656: VPP commit fail message is not clear for max-map-count option, a subtask of T7070: VPP related bugs the root task, as Resolved.
natali-rs1985 closed T7656: VPP commit fail message is not clear for max-map-count option as Resolved.
We'll move host-resources to another section. https://vyos.dev/T7678
natali-rs1985 removed a project from T7656: VPP commit fail message is not clear for max-map-count option: VyOS 1.5 Circinus.
c-po moved T7403: container: cannot remove image when used by more then one tag from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
c-po moved T7403: container: cannot remove image when used by more then one tag from Backlog to Finished on the VyOS 1.4 Sagitta (1.4.4) board.
c-po moved T7484: ARM64 config fails to commit due to ttyS0 console from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
c-po moved T7484: ARM64 config fails to commit due to ttyS0 console from Backlog to Finished on the VyOS 1.4 Sagitta (1.4.4) board.
c-po moved T7671: Move AWS GLB CLI configuration to a separate package from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
c-po moved T7671: Move AWS GLB CLI configuration to a separate package from Need Triage to Completed on the VyOS Rolling board.
c-po moved T7671: Move AWS GLB CLI configuration to a separate package from Backlog to Finished on the VyOS 1.4 Sagitta (1.4.4) board.
Aug 5 2025
Aug 5 2025
L0crian updated subscribers of T7322: Addition and deletion of allowed-vlans on a bridge member is slow.
I just noticed this was mentioned as being added to 1.4.3 in the release notes:
Other resolved issues
jestabro moved T7688: Correct the management of delete paths on vyconfd delete and commit requests from Need Triage to Completed on the VyOS Rolling board.
Viacheslav changed the status of T3680: Static routes with dhcp-interface are flaky from Open to In progress.
Aug 4 2025
Aug 4 2025
Viacheslav changed the status of T7686: Add user-defined MAC address to dummy interfaces from Open to In progress.
Viacheslav added a project to T7681: Settings multiple DNS resolvers for containers prevents container start: Restricted Project.
Viacheslav added a comment to T7681: Settings multiple DNS resolvers for containers prevents container start.
@starcraft66 Would you like to create a fix?
The code here https://github.com/vyos/vyos-1x/blob/35f333b26326940e5e0cf3f97eb99dbb55a77e08/src/conf_mode/container.py#L409
Viacheslav moved T7639: SRv6 uSID IS-IS capability from Need Triage to Completed on the VyOS Rolling board.
Viacheslav moved T7639: SRv6 uSID IS-IS capability from Open to Finished on the VyOS 1.5 Circinus (1.5-stream-2025-Q3) board.
MattK updated the task description for T7685: WAN load balancing rule fails when using comma-separated ports.